Construction

What it is for: preparing construction quotes with your own prices, measuring during the site visit from your mobile, working out what to buy and from whom and, with Pro, certifying completed work and keeping change orders, subcontractors and the site diary. The amounts are calculated by the system, never by the AI.

Where to find it: menu Construction: Construction quotes, New site visit, Expiring documents, Purchases and Price book.
Who sees it: anyone who has the Construction module and the Suite (without the Suite there is nowhere to issue the quote). Certifications, change orders, subcontractors, the site diary and Expiring documents belong to Construction Pro. The project and building tools (further down) belong to Construction Elite, which includes everything in Pro. Expiring documents appears in the menu even without Pro, but when you open it, it tells you it is a Pro screen. If you do not see the group in your menu, ask our support team.

What you see first

  1. Construction quotes: at the top, the field to name a new quote and a link to Price book and margins. Below, your quotes grouped by stage: New, Visit scheduled, Visit done and measured, Quote sent, Negotiation, Accepted and signed, Planning, On site, Handover, Warranty and Lost.
  2. Price book: your items with labour, material and equipment, and your margins.
  3. Purchases: your suppliers, materials and recipes.
  4. New site visit: the mobile screen for measuring on site.

Step by step

Load your price book

This comes first: the price book holds your prices, and quotes are built from it.

  1. Open Price book.
  2. To load many items at once, use Import price book: upload an Excel or CSV file (code, description, unit, labour, material, equipment and unit price) or a BC3 file.
  3. Assign each column, press Preview and check the valid rows and the ones with errors. If the breakdown does not add up to the unit price, that row is rejected with its number.
  4. Press Import the valid rows.
  5. To add a single item, use Add an item: code, description, unit, labour, material and equipment as a percentage of labour. If you work with quality levels, give the quality group and the quality (Basic, Average or Premium). Press Save item.
Set your margins
  1. In Price book, under Company margins, enter the overheads by amount band and the contractor's profit.
  2. Tick or untick the box to apply and show overheads and profit. On small refurbishments it is better to untick it: the margin goes in your rates.
  3. Press Save margins.
Create a construction quote
  1. In Construction quotes, type the name (for example, the refurbishment and the street) and press New construction quote. The quote opens.
  2. Add chapters (Masonry, Plumbing…) and, inside each, items from your price book with their quantity. You can adjust an item's price for this job only: it is marked as a special price.
  3. Under Tax details of the work, say who is hiring (private individual, owners' association, company or public body), whether the work is on a home and how old it is, and whether reverse charge applies. The system uses this to decide the VAT that will apply. Check the rate before sending anything.
  4. Under Job tracking, choose the Stage and press Save stage. If you move it to Lost, it asks for the reason.
  5. Press Save and recalculate. Below you see the Totals: the material execution budget by chapter, overheads and profit (if you show them), the taxable amount, VAT and the total.
  6. To save time, under Templates and quality you can apply a template or save this job as a template. Templates store items and quantities, never prices. You can also switch the whole job to another quality level.
Turn it into a sales quote
  1. With everything saved, press Create quote in Sales.
  2. The notice Quote created for… appears with the link Open it in Sales to send it. From there it is sent like any other quote: see Quotes and invoices.
  3. You can also create a single quote with the three quality levels, or three quotes, one per quality. Items need their group and quality in the price book.
Measure during the visit from your mobile
  1. On your mobile, open New site visit.
  2. Type the job or the customer.
  3. Add each room with its name (Bathroom, Kitchen…) and its length, width and height. Add its openings (doors and windows) with their width, height and units.
  4. Write, or dictate, what needs doing. For example, "tile up to the ceiling, replace the shower tray, 4 light points".
  5. Press Prepare quote. The AI suggests the items; the quantities and prices are calculated by the system from your measurements and your price book. It uses your AI balance: see Balance, usage and providers.
  6. The Draft ready notice appears. Check quantities, prices and VAT before sending anything to the customer, and press Open the draft.

Photos are stored on your mobile: for now they are not uploaded and the AI does not read them. If there is no signal, the visit is saved on your mobile and sent automatically when you are back online.

Prepare what needs buying
  1. In Purchases, add your Suppliers.
  2. Under Materials, define each one: code, site unit, purchase unit, how many site units one purchase unit holds and the waste percentage. Example: tiles in m² on site and boxes of 1.44 m² for purchase, with 10 % waste.
  3. Under Recipes, say which material each item uses and how much per unit of the item.
  4. Under Prices by supplier, record each material's price per purchase unit (excluding VAT).
  5. In a quote, press Shopping list and orders. You see What needs buying, with what is needed and what to buy including waste, and notices for items without materials or materials without a price.
  6. Under Orders by supplier, enter the delivery date and address and press Create order.
  7. Open the order. Press Copy text and paste it into WhatsApp or an email to your supplier: for now it is not sent automatically from here. Then press Mark as sent.
  8. When the material arrives, use Upload delivery note photo: the AI reads it and the system compares it with the order. The photo is not stored.

With Construction Pro

These screens open from the quote itself, with the buttons below the totals.

Certifications and change orders
  1. Press Certifications and change orders.
  2. Under Retention and advance for this job, enter the retention percentage and the total advance received. Press Save.
  3. Under New certification, enter the cumulative quantity executed for each item, that is, to date. It cannot go below the previous one or above what was contracted: to go beyond that, create a change order. You can also press Use what the diary recorded.
  4. Press Calculate. You see progress to date, this month's execution, the retention, the advance and the amount To pay now.
  5. Press Save certification and then Create invoice in Sales.
  6. Under Change orders for this job, press New change order, describe what is added or changed, add items from your price book and press Create change order.
  7. To approve it, press Ask the customer to sign and send them the link, or note how they approved it with Approve without signature. If they do not accept, Mark as rejected.
Subcontractors and job closing
  1. Press Subcontractors and job closing.
  2. With Add subcontractor, enter who it is, who hires it, its level, its registration in the accredited contractors register and the declared percentage of permanent staff. The system tells you whether it May enter the site or Should not enter the site.
  3. Add its documents with their expiry date and its workers.
  4. The Subcontracting book collects all the job's subcontractors.
  5. Under Job closing, mark each step as pending or done. Below you see the warranties from handover (finishes, habitability and structure).

This helps you keep track of the paperwork. It does not certify that you comply with the law: the thresholds are indicative and your adviser should review them.

Expiring documents
  1. Open Expiring documents.
  2. You see what has expired and what expires within 30 days, across all your jobs. Press the job's name to go to its subcontractor.
  3. For now you have to check this list yourself: it does not alert you on its own yet.
Site diary and cost
  1. Press Site diary and job cost.
  2. Under Today's report, say what was done, who was there, what happened and what material is missing, by speaking (Dictate) or typing. Press Organise with AI, check what it suggests and press Save report. There is one report per day: if one already exists for that date, it is updated.
  3. Below you see the Diary, progress according to the diary, forecast cost against actual cost and open snag items. Actual cost is the orders sent or received plus the costs you record there.
  4. Under Snag items, note what needs fixing and who is responsible.
  5. Under Weekly summary for the customer, press Write this week's summary. The AI writes it from the week's diary. It is never sent automatically: you check it, press Approve and Copy to send.

With Construction Elite

The Elite tools are inside each quote: open one and you will see the buttons Project and measurements and Building: cost, purchases and developer. In the Construction quotes list you also see Import the project (BC3).

Import the project
  1. In Construction quotes, press Choose .bc3 file and upload the file the architect gives you.
  2. Its chapters, items and measurements are read. Each item takes the price from your price book if the code and unit match; if not, the project's price, marked as "project price".
  3. Check the notices: items without a price come out at zero so you can complete them.
  4. Press Create the job quote.
Project against contractor
  1. In the quote, press Project and measurements.
  2. Under Project against contractor you see, by chapter, the project price, yours and the deviation. Positive means your price is higher than the project's. Below are the items with the biggest deviation.
  3. If the quote does not come from a BC3 project, there is nothing to compare with and the screen says so.
Measurements from Excel and by hand on the plan
  1. Under Measurements from Excel, upload an Excel or CSV file with one row per measurement line and the item code. The quantities are calculated by the system. Press See what would change and, if it is right, Apply to the quote.
  2. Under Measure by hand on the plan, choose a plan as PDF or image. Press Set scale, mark two points a known distance apart and enter the real metres. The longer that distance, the more accurate the measurement.
  3. Draw the areas, lengths or units, choose the item for each measurement and press Transfer to the quote.

The plan opens in your browser and is not uploaded anywhere.
If the quote already has certifications, it cannot be changed with these tools.

Reading a plan with AI

In Project and measurements, the Measurement from plans (PDF) section suggests measurements from a plan.

  1. Enter the Plan scale (for example, 1:100) and, if you like, some Notes for the reading, such as "Ground and first floor; ignore the roof".
  2. Press Choose plan as PDF and then Read the plan with AI.
  3. A table appears with each suggested measurement. Look at the Source column: read is something written on the plan, such as a table of areas or a dimension, and is reliable; estimated is worked out from the scale and is only a guide, so check it. If you correct it, it becomes corrected.
  4. Untick the ones you do not want and choose the Item for each. The quantities are calculated by the system, not by the AI.
  5. Press Transfer to the quote. Reload the quote to see the measurements.

The reading is deducted from your AI balance. The PDF is not stored: each measurement only keeps the file name and the page. If the quote already has certifications, it cannot be changed.

Building

In Building: cost, purchases and developer you enter the building's data (homes, built m², blocks or phases) and the system calculates the forecast cost per home and per m². That is also where you keep purchases by phase, offers from several suppliers, supplier invoices, stockpiles, crews and after-sales deadlines. The screen has four tabs: Cost and building, Purchases, Site and Developer and signatures.

Developer portal and signature by the site management

On the Developer and signatures tab:

  1. Developer portal: enter the Developer's email and press Activate the portal. It gives you a private link. The developer sees the progress of the work, the certifications, the photos you choose and the warranties; never costs, margins or supplier prices. The diary photos you mark "for the developer" are the ones shown.
  2. Notify the developer by email sends a notice with the optional message you write. Refresh changes the email and Disable makes the link stop working.
  3. Signature by the site management: on each certification, enter the Site manager's email and press Request signature. They receive a link where they enter their name and professional registration number and accept. It is recorded with date and time, and the certification shows as signed by the site management.

This is a simple signature with evidence, not a qualified electronic signature.

If something does not go as expected

What happensWhyWhat to do
I do not see the Construction group in the menuYou need the module and the SuiteAsk our support team
"This module is not active on your account"Your account does not have the moduleAsk our support team
"Expiry tracking belongs to Construction Pro" (or certifications, change orders, subcontractors, site control)That screen is Pro and your account does not have itAsk our support team
"The comparison with the project belongs to Construction Elite"It is Elite and your account does not have itAsk our support team
Create quote in Sales is disabledThere are unsaved changes or no itemsPress Save and recalculate and add at least one item
"This job does not generate a shopping list yet"The items have no materials definedDefine the recipes in Purchases
A material shows "without a price from any supplier"Its price is missing under Prices by supplierEnter the price
"This job already has certifications: the quote cannot be changed"Once a certification exists, measurements are lockedTo add anything new, create a change order
On the visit I cannot prepare the quote because of no balanceThe AI is paid from your balanceSee Balance, usage and providers
The developer portal shows an error or "not found"The portal is disabled or the link is an old oneIn Developer and signatures press Activate the portal and send the new link
Notify the developer by email is greyed outThe developer's email is missingEnter it and press Refresh
The plan reading marks some measurements as "estimated"They come from the scale and are not written on the planCheck them before adding them, or correct them
A price book row is rejected on importThe breakdown does not add up to the unit price, or some amounts are not numbersFix the row and import again

Related

Still stuck? Talk to us

Construction · EK1